yellowhouse_
New member
- Joined
- Jan 6, 2026
- Messages
- 3
my partner and I are building a house and getting a 28x8.5 shell built.
the plan is to put the bathroom at one end and the kitchen at the other to maximize the layout
Since we’re finishing the interior ourselves, what should we be thinking about for plumbing?
is running pipes 28 feet across the house a nightmare for drainage or venting? Need some tips and advice on how to plan the lines before the shell arrives?
the plan is to put the bathroom at one end and the kitchen at the other to maximize the layout
Since we’re finishing the interior ourselves, what should we be thinking about for plumbing?
is running pipes 28 feet across the house a nightmare for drainage or venting? Need some tips and advice on how to plan the lines before the shell arrives?