Pirate_Anji
New member
- Joined
- Sep 7, 2025
- Messages
- 1
I'm planning an 8x12 shed/office build in my backyard here in Utah. The site drops about 18" corner to corner, and the ground stays soggy in the spring from snow melt and runoff. I want to avoid pouring a slab since I'd rather not add more impervious surface and make drainage worse.
My current thought is a gravel pad boxed in with 4x4s, extending it past the shed footprint to help with infiltration. But I'm not sure if that's really the best option on a slope. Has anyone here in Utah (or similar climate) done a small shed or insulated office on a sloped, wet site? What kind of foundation worked for you?
My current thought is a gravel pad boxed in with 4x4s, extending it past the shed footprint to help with infiltration. But I'm not sure if that's really the best option on a slope. Has anyone here in Utah (or similar climate) done a small shed or insulated office on a sloped, wet site? What kind of foundation worked for you?